Rhyme or Reason For Rejected Road Edits

I’ve really ramped up editing roads locally after getting inspired by The 1001 Roads Added post by @LaloPadilla , and the great post on the New Road Editor by @ErmesT . I was on a roll and added about 100 new roads in a month.

Lately, however, most of my contributions have been denied. What’s odd is that I am not just adding random visible stretches, as you would in Road Mapper. I take the time to research data provided by local municipalities and counties.

Where I live, a “County Assessor” office will post up-to-date information on zoning, property ownership, and the most current information on new developments. This is the data used to update the map, yet, my edits are being rejected en masse. I often add roads to sections of the map that show the development outlines, and I am still rejected.

I understand that the edit may be rejected if someone else has already made the edit and the map has not been updated. It would be nice to have “Someone Beat You To It” as a rejection reason or an appeal option to plead my case for the research I put into adding roads.Maybe my trust score is down from so many rejections? Only the Googs can know. I’ll just keep plugging away and hoping for acceptance rather than the constant rejection :sob: .

From your screenshot it looks like you might not be aware that new roads need to be connected to an existing road, @JustJake .

Also, you may want to consider the Google Maps program enabling local and regional partners to upload their data directly and automatically. Please learn more here: Google Maps Content Providers
Examples include municipalities and public transport providers.

Cheers
Morten

Hi @JustJake

Do you have a link of the position of the rejected edits? The approval of a road require a few basic elements:

  • the road should be visible in satellite mode in Google Maps
  • The road should be connected to some other road (be part of a network). This is a basic principle also in Road Mapper.

To respond to your question, there is no way for Google Maps to approve your edits if both the mentioned conditions are not present-

If the country assessor is posting up-to-date information on the new development, they can add the same information in Google Maps, by using the feature shared by Morten. The same can be done by the Housing developers. I can add that this happens already frequently in USA

Hi @ErmesT & @MortenCopenhagen , thank you for getting back to me. All the places I’m adding connect to other locations, though I will say that as a points accumulator, I do not always make every edit simultaneously. Perhaps this disqualifies subsequent road segments if the one connecting to an existing road has yet to be approved. I also theorized that everything would get rejected if I’d made many edits in one shot and one edit was not approved.

Regarding visible roads, if there is no footprint or base map, I will not attempt to freehand the streets. Some areas, however, present different satellite images when you open the editor such as this location.

Other places such as this reject despite visible streets and other roads for connection.

Stranger, yet, some locations like this one not only have a base map showing the land/road layout but also address numbers. Still, not applied and no roads.

I suspected some of our counties were updating the maps themselves. But if everyone did that, what would I have to do for fun?!? :grin:

@JustJake about the “Someone Beat You To It” thing you mentioned: my experience is that they have actually changed this. If another LG makes that same edit and gets it approved, you will no longer het a ‘Not applied’, but also an ‘Approved’ (although you will not be rewarded points for that edit, only the other LG gets them).

I actualy had a section about that in the latest podcast episode.

@JanVanHaver That’s right! I should have remembered that. I caught the episode on a long drive for work a couple of weeks ago. I was surprised you were unaware of the tap & slide zoom function. It’s invaluable when holding the phone while driving (and eating a cheeseburger with the other hand because I’m American) :joy: :selfie: :hamburger: :blue_car:

Haha @JustJake

This was before TRAC came into existence. You should be a very prominent person on adding roads then.

Thanks for sharing the link to this post man.

Happy guiding
Cheers

Not much has changed since the date of your original post @JustJake. I don’t get a lot of instant rejections, but many of my roads remain in the Pending state and finally fail when the 90 day time limit expires.

In the recent TRAC 2025 program, I drew 1076 roads and saw 292 approvals - that’s a 27% rate.

I’ve continued to track my contributions since then and have done a further 677 roads, with 147 approved up to today’s date - a 22% success rate.

(Thanks for resurfacing these old threads @SholaIB).

Hello @tony_b ,

That isn’t wonderful achievements really,I’ll say the approval rate is pretty too low. Meanwhile I feel those adding in bulk constantly(200-500 a day) they are those who have high approval rate. I really haven’t enough time to dedicate even 2hrs a day to adding roads!

Mind you TRACians are on holidays so why spoil it. Lol.

Happy guiding
Cheers

That’s pretty disheartening. Mine has been very low, too. I haven’t tracked my contributions since the email language changed, so I have no idea where I’m at. Last year was in the 70s-80s.