Google Maps Streets edit

Hello, when I submit a road edit on Google Maps, do you know if it is a human who checks it or an AI?

Thank you!

Hello @Franco_Mira,
Google never publishes these kind of internal procedures According to @ErmesT it is very likely both: first an automated filter and then a human operator.

Thanks for the tag, @WilfriedB , and hi @Franco_Mira .
The evaluation of our road edits is a constantly evolving process. Since the ability to add roads is a public feature available to all of Google Maps’ 500+ million users, it is physically impossible for one or more operators to directly verify every road we add. This therefore requires a multi-level process, which can be simplified as follows:

  • AI performs a preliminary analysis of our edit. The goal is to verify whether the edit is consistent with the satellite view. If the road is not deemed consistent, the edit is immediately rejected; otherwise, it enters “pending” status and moves to the next phase. Furthermore, to be acceptable, a road must necessarily be connected to an existing road.
  • The second step could be defined as that of “priority relevance”: a road that could potentially be used by a larger number of users is presented to operators for confirmation with a higher priority than a road with a lower potential usage level.
  • The third step is where the operator confirms the AI’s proposal, releasing the roads according to the priority sequence suggested by the AI.

Each confirmation or rejection by the operator serves to further train the AI, which will progressively improve its analytical capabilities.
Furthermore, to prevent a road deemed “low-relevance” from remaining pending indefinitely, any item not approved within 90 days is automatically rejected.
We could discuss the process at length and in greater detail, but the fundamental concepts are those outlined above. For further details, I recommend reading: 3000+, and counting. My tips for adding roads in Google Maps
More than three years have passed since that post, and I now have over 94,000 approved streets, but the basic concepts remain fundamentally the same.

Hey there, thank you both!